Exclusive type for Nigeria, built for complex road, transport safely!
The SinoCleansky 63 m³ LNG cryogenic semi-trailer carries up to 25,515 kg of LNG per load - approximately 35,000 Nm³ of natural gas after regasification. High-vacuum multi-layer insulation delivers a static evaporation rate of ≤0.21%/day and a 30-day holding time - moving every load farther and longer as the workhorse for regional supply and fuel distribution.
Max single-load volume: 63 m³ nominal capacity with a max filling of 56.7 m³ / 25,515 kg LNG - about 20% more payload per trip than a 52 m³ trailer
30-day holding time: high-vacuum multi-layer insulation with aluminium foil, seal-off vacuum ≤0.08 Pa, static evaporation rate LIN ≤0.21%/day
Light tare, heavy payload: cold-stretched thin-wall S30408 inner vessel at just 5 mm thick, curb weight only 18,800 kg
3-axel / air suspension / 7+ baffles, anti-skid plate to suppress the liquid vibration during braking
Triple safety protection: pneumatic emergency shut-off valves + inner-vessel / line / jacket safety valves + centralized venting, MAWP 0.65 MPa (test 0.87 MPa)
Stable transport: BPW three-axle air suspension plus no fewer than 7 surge baffles inside the tank to suppress sloshing
20-year durability: pickled & degreased surfaces, Jotun coating ≥200 μm DFT, stainless-steel rear double-door valve cabinet.
Detailed value propositions
Max Single-Load Volume
63,000 L nominal volume with a max liquid filling of 56.7 m³ (filling coefficient ≈0.9) - one unloading covers several days of demand for a mid-size satellite station. The 44,315 kg laden mass stays within standard tractor-trailer limits, so the unit slots into existing fleets without special permits.
30-Day Unhurried Turnover
Foil multi-layer insulation achieves a seal-off vacuum of ≤0.08 Pa with an annulus leak/outgassing rate on the order of 1×10⁻⁷ Pa·m³/s, giving a static evaporation rate of ≤0.21%/day on LIN and a 30-day holding time for LNG - even an unexpected delay in transit never forces an emergency vent.
Cold-Stretched Thin-Wall Inner Vessel
Built to the T/CATSI 05001-2018 cold-stretching requirements, the S30408 shell holds 0.65 MPa at just 5 mm thick, bringing curb weight down to 18,800 kg - less tare means more payload and a lower transport cost per kilogram delivered.
Triple Protection with Pneumatic Shut-Off
The tank carries an integrated inner-vessel safety-valve set and line safety valves, while a dedicated jacket safety valve monitors vacuum loss. Pneumatically actuated emergency shut-off valves (AV series, air-supply controlled) cut flow at a single remote command; the centralized vent header collects every relief line for elevated discharge, with check valves preventing back-flow.
Fully-Specified Chassis, 20-Year Durability
A Tonghua BPW three-axle chassis with air suspension, drum brakes, Double Coin 315/80R22.5 RR738 tyres and high-strength steel rims; reinforced 90# kingpin base and landing legs rated for full-load support. Surfaces are pickled and degreased, the jacket shot-blasted to SA 2.5 and coated with Jotun paint ≥200 μm DFT, surge baffles number at least 7, and each unit leaves the factory after a 0.65 MPa pneumatic test, purged and sealed under 0.05 MPa nitrogen.
Typical applications
Scheduled replenishment of LNG satellite and vaporization stations beyond the pipeline grid
Daily LNG deliveries to refueling stations for heavy trucks, buses and marine fuel
Point-of-use gas supply for industrial furnaces in glass, ceramics and metal processing
Flexible capacity for city peak-shaving and emergency supply

ITEM | PARAMETERS | ||
1 | Model No | SCSJ-ASME-63m³-0.65MPa | |
2 | Total Volume | 63M³ | |
3 | Effective Volume | 56.7M³ | |
4 | Loading Medium | LNG | |
5 | Design Code | ASME VIII, Div.1 | |
6 | Main Material | Inner Vessel | S30408 |
Outer Vessel | Q345R | ||
7 | Design Temperature | ‐165/50℃ | |
8 | Working Pressure | 0.65Ma | |
9 | Isolating Type | High Vacuum Multilayer Insulating | |
| 10 | Max Filling | 25,515kg | |
| 11 | Curb Weight | 18,800kg | |
| 12 | MPGM | 44,315kg | |
| 13 | Dimensions(LxWxH) | 15,100 × 2,600 × 3,950 mm | |
| 14 | Evaporation Rate | ≤0.21%/day | |
| 15 | Holding Time | 30days | |
SinoCleansky LNG lorry tanker are manufactured under strictly quality control system. The LNG lorry tanker are with inspection report submitted to clients, including such as: Hydrostatic test, X-rays test to weld, Non-destructive test, Helium-Leakage Detection, Vacuum Test. With client’s requirements, SinoCleansky will also provide some other certificates as per clients’ request. We assure you that all LNG lorry tanker are 100% traceable.
Comprehensive inspection reports: Clients receive full documentation, including:
Hydrostatic test report (1.05MPa, no leakage).
X-ray/ultrasonic NDT reports (100% weld inspection).
Helium leak detection report (no leaks).
Vacuum test report (insulation performance).
ASME compliance: Manufactured to ASME Section VIII, Division 1, with a Manufacturer’s Data Report (MDR) signed by a commissioned inspector.
Traceability: 100% traceable raw materials and components—each part (vessels, valves, nozzles) has a unique serial number and quality certificate.
Warranty: 3-year warranty for the inner/outer vessels (cryogenic durability) and 1-year warranty for valves/safety accessories. SinoCleansky provides on-site maintenance training and spare parts support.
Reference certifications and reports:



Delivered as a complete tractor-free, gas-free trailer: the 15.1 m unit ships by oversize road haulage or RoRo sea freight - outside ISO container dimensions, so destination oversize-load permits must be arranged.
Lift only from the designated tank lifting lugs and reinforced points - never from the valve cabinet, piping or bumper
On arrival, verify jacket vacuum and holding pressure (0.05 MPa nitrogen positive); report any anomaly to the manufacturer within 24 hours
Before first connection, confirm the pneumatic supply to the emergency shut-off valves, check every valve against the P&ID, then pre-cool slowly - no thermal shock
Random documents, special tools and recommended spares (seals, valves) ship with the unit; verify them at receiving

What is the practical benefit versus a conventional 52 m³ LNG semi-trailer?
A Each trip carries up to 25,515 kg of LNG - roughly 20% more than a 52 m³ unit. For regional supply that means about one trip fewer in every six for the same fleet, directly lowering the logistics cost per kilogram delivered.
What do the ≤0.21%/day evaporation rate and 30-day holding time mean in practice - will pressure build up on long hauls?
A Even standing still, less than 0.21% of the load evaporates per day; it takes up to 30 days for pressure to reach the 0.65 MPa limit, and dual relief paths (inner-vessel/line safety valves plus centralized venting) provide backup. A normal cycle - fill, haul, unload in 3-7 days - stays well below any relief setpoint.
What are the lead time and certification arrangements?
A Design and manufacture follow ASME VIII, Div.1 and NB/T 47058-2017 & T/CATSI 05001-2018, with the vehicle configured per Chinese type-approval and dangerous-goods transport requirements. Standard lead time is confirmed at inquiry (variant configuration and chassis batch affect scheduling); export versions can be supplemented with destination-country certification documents.
Refuel Anywhere! SinoCleansky recently launched new solution for areas without pipeline, a CNG mobile refueling station. Integrated compressor, gas storage, dispenser, PLC and silenced cabinet on ONE skid. Easy to deploy and move, by MRU, you can refuel anywhere!
SinoCleansky participated Hospitalar 2026 in Brasil, Let's explore it together!
FABTECH Mexico 2026 was held from May 12 to 14, 2026, at the Centro Banamex International Convention and Exhibition Center in Mexico City. As the largest and most influential international trade show for metal fabrication, welding, and industrial manufacturing in Latin America.Compared to the 2025 e
SinoCleansky made its first-time appearance at this premier event, showcasing its full range of medical gas supply solutions at Booth H-60, demonstrating to the Latin American market the technological strength and product excellence of China's leading gas container manufacturer.
SinoCleansky will participate Hospitalar 2026 at May 19–22, São Paulo Expo, Brazil. As we celebrated 20 years of excellence, this Hospitalar show marked another milestone in SinoCleansky's expanding global presence. The connections made and partnerships forged here will drive our growth in the Latin American market and beyond. Thank you to everyone who visited our booth. We look forward to building on this momentum together.
SinoCleansky Shines at Mexico Industrial Trade Show SinoCleansky proudly showcased our latest product line at a major industrial exhibition in FABTECH Mexico. The event brought together industry professionals from across the Americas and beyond. Our team delivered warm, professional consultations to visitors — walking them through product specifications, application scenarios, and custom project requirements. From technical deep-dives to new business discussions, every conversation reflected our commitment to customer success. As we celebrated 20 years of excellence, this FABTECH Mexico show marked another milestone in SinoCleansky's expanding global presence. The connections made and partnerships forged here will drive our growth in the Latin American market and beyond. Thank you to everyone who visited our booth. We look forward to building on this momentum together.
Avoid costly port delays. Master essential LNG ISO tank shipping documents, IMDG compliance, and customs clearance for safe global transit.
Avoid costly procurement errors. Compare ASME vs EN LNG storage tank standards to ensure global compliance, optimize payload, and maximize safety.
Master ISO 11120 CNG Container procurement. Discover technical specs, safety compliance, and payload optimization for high-pressure gas transport.
Building a CNG gas plant? Avoid costly delays and stranded assets. Learn to navigate utility constraints, optimize equipment, and maximize fleet ROI.
Avoid seized shipments. Master CNG Jumbo Tube Container certification, mandatory approvals & third-party validation for seamless export.
Ambient Vaporizer should be tailor-made for on-site gas consumption. Below is Asia customer tailer-made Vaporzier to complete on-site demande.Customer in European selected Microbulk Regas Skid, vaporizer built in, quick pressure increasing function meet their reqirement, no need to buy Vaporzier sep
In Malaysia, a leading LNG company, has revolutionized its operations using our Microbulk Tank and ISO Tank. Leverages ISO Tanks for efficient LNG transportation to its sub - stations. These robust ISO Tanks ensure safe and reliable delivery, even over long distances. At the sub - stations, our Micr
Jumbo Tube Container Transforming CNG Transport for Global Clients. SinoCleansky Jumbo Tube Containers have become a game - changer for gas transportation across international markets. In Nigeria, a CNG company, and a Brazil energy enterprise co-partner all rely on our Jumbo Tube Skid and Jumbo Trai
Cryogenic Cylinder - Thailand's Low-Temperature Bottle Storage Application
Lorry Tanker Transforming LNG Logistics in Nigeria and Vietnam. What distinguishes our solution is its integrated design: a high-performance cryogenic storage tank paired with a purpose-built operation compartment. This combination eliminates the need for separate transport and filling equipment, en
In Mexico, an energy operator deployed SinoCleansky large horizontal LNG storage tanks as the core storage equipment of its LNG receiving and distribution hub, supporting the scaled natural gas demand of refueling station networks and industrial users, with excellent cryogenic insulation and low Ner.
Use SinoCleansky LNG Microbulk tanks for on-site LNG storage and vaporization at end-user premises, replacing traditional cylinder supply and markedly improving supply continuity and operating efficiency for small and medium commercial and industrial customers
Industrial gas and LNG companies across nations have unlocked new efficiency with our ISO Tank. Its standard container design integrates into diverse transport systems—road, rail, sea—adapting to global logistics needs. For cryogenic gas transport, it's the best transport container. Inside the opera
Choosing the right CNG transport and dispensing equipment is essential for building a reliable virtual pipeline. This guide compares CNG tube trailers, MEGCs, and jumbo tube cascades, explaining how transport mode, payload capacity, site space, delivery frequency, and pressure management affect equipment selection. CNG tube trailers are suited to high-volume road transport, while MEGCs provide greater multi-modal flexibility. Jumbo tube cascades support efficient gas storage and dispensing at the destination. By matching equipment capacity with demand, site conditions, and regulatory requirements, project teams can improve logistics, control operating costs, and maintain a stable CNG supply.
Email:
Telephone:
Mobile & WhatsApp:
Address: